Broomfield unanimously approves UCHealth hospital site plan

The plan covers a 367,000-square-foot hospital and a 169,000-square-foot medical office building near Interstate 25 and Colorado 7.

Published at

Broomfield City Council unanimously approved UCHealth’s final plat and site development plan Nov. 10 for a hospital and medical office building at the northwest corner of Interstate 25 and Colorado 7. The project’s first phase includes an approximately 367,000-square-foot, six-story hospital and a 169,000-square-foot, four-story medical office building, along with related infrastructure, the council’s resolution and staff report say.

The approved plat creates four lots and three tracts and dedicates utility and public-access easements. The hospital and medical office building are planned for Lot 1; the other lots are for future development.

The site plan describes a full-movement entrance from the Huron Street side and a proposed three-quarter access from Colorado 7, with a left turn for eastbound traffic and right-in/right-out movements for westbound traffic. The Colorado Department of Transportation had not approved that highway access when the staff report was prepared. If the state does not approve the proposed configuration, it could be changed to right-in/right-out through an administrative plan revision. A third access, from Lowell Lane, is anticipated with future development of Lot 3.

A separate proposed subdivision improvement agreement would address Colorado 7 improvements, a contribution toward a traffic signal at Huron Street and Colorado 7, and a grade-separated pedestrian crossing beneath Colorado 7. Those improvements are not part of Resolution 2026-119, which approved the final plat and site development plan.

At the hearing, UCHealth representatives said they hoped to begin site work shortly after approval, with construction potentially starting before the end of 2026 or in early 2027. The Broomfield Enterprise reported that the presentation set a fall 2029 opening target. These are project expectations, not deadlines set by the council.